Tamil Nadu is home to one of the largest automotive clusters in Asia. Every supplier to an OEM is expected to use the five core tools referenced by IATF 16949.
APQP — Advanced Product Quality Planning
A structured plan for launching a new part, from concept to production, with defined phase gates and deliverables. It makes sure nothing is forgotten before start of production.
FMEA — Failure Mode and Effects Analysis
The AIAG-VDA FMEA handbook uses a seven-step approach and Action Priority (AP) instead of the old RPN number. Design FMEA protects the product; Process FMEA protects the manufacturing process.
MSA — Measurement System Analysis
Before you trust data, check your gauges. Gauge R&R, bias, linearity and stability studies tell you whether variation comes from the part or the measurement.
SPC — Statistical Process Control
Control charts and capability indices (Cp, Cpk, Pp, Ppk) show whether a process is stable and capable of meeting specification. Many customers require Cpk ≥ 1.33 for ongoing production and ≥ 1.67 for launch.
PPAP — Production Part Approval Process
The evidence pack you submit to the customer: drawings, design records, FMEA, control plan, MSA, dimensional results, material test results, capability studies and the Part Submission Warrant.
Our 4-day core tools workshop builds a PPAP file for a sample part so participants leave with templates they can use the next day.